2002-01-04T00:25:15.000 \header System = GRS Author = mward Institution = UofAz Start_time = 01/11/02 00:00 Stop_time = 01/12/02 00:00 Send_time = Fri Jan 04 00:25:15 GMT 2002 \text Purpose: Power on the gamma subsystem as part of the post-AB checkout Expected result: The gamma subsystem will power on Why it is needed: To enable the gamma subsystem power - to verify that the subsystem is Commands to be sent: /home/grs2001/software/SC_Commands/Post-MOI_1/bce_sasf/c01grs_gam_inst_power_o 2001, immediate, CHG_STATE, Gamma, ON Contingency _Commands/Post-MOI_1/bce_bcf/c01grs_dump_test_10.bcf 1151, immediate, DUMP_SEQ, 1, 1 1161, + 0-3 , DUMP_SEQ, 11, 1 1179, + 0-6 , DUMP_SEQ, 29, 1 1352, + 0-9 , DUMP_ANALOG 1353, + 0-9 , DUMP_PARAMS 1355, + 0-15 , DUMP_FPGA_REGS, 0 1356, + 0-18 , DUMP_FPGA_REGS, 1 1363, + 0-21 , DUMP_COUNTS