2007-03-29T00:21:44.000 \header System = GRS Author = krisk Institution = UofAz Start_time = 03/29/07 20:00 Stop_time = 03/29/07 21:00 Send_time = Thu Mar 29 00:21:44 GMT 2007 \text Purpose: Power cycle LANL HVPS2 and reset to level 5, followed by a standard dump. Expected result: LANL HVPS2 will turn off, ten minutes later it will turn on at level 5, and Why it is needed: LANL HVPS2 voltage is lower than expected, and this is a test to see if a power cycle will take care of the necessary adjustment or whether a change to Commands to be sent: /home/krisk/Commands/c01grs_lanl_hvps2_lvl5_cycle.bcf 1829, immediate, LANL_HVPS, 2, OFF 1825, + 580 , LANL_HVPS_CNTL, 2, 5 1828, + 600 , LANL_HVPS, 2, ON 1041, + 620 , EXEC_SEQ, 41, 0 2007-03-29T23:09:32.000 \header System = GRS Author = krisk Institution = UofAz Start_time = 03/29/07 20:00 Stop_time = 03/29/07 21:00 Send_time = Thu Mar 29 23:09:32 GMT 2007 \text Purpose: No op command to test asp/dom after router switch. Expected result: Nothing will happen, and command will not be sent. Even if it were in Why it is needed: To verify that the asp and dom are working properly after the router switch. Commands to be sent: /home/krisk/Commands/c01grs_no_op_command.bcf 999, immediate, NO_OP