Gene, Danny: Here is the time line for the MEX BSR Thursday morning. This starts very slowly, but the pace picks up and we may be a little stressed by the time it is over. We have 81 minutes of tracking before S-Band even comes on. There is an ingress occultation, which we can collect. Minical #1 and a pretend SLEW #1 (none is needed) fit very comfortably within the 43-minute occultation. The BSR begins at exit occultation with the carriers on the high edges of each filter. After 6 minutes (18:29) we start updating the 25 kHz X-Band FRO, then continue this every two minutes. There's also an update to the 25 kHz S-Band FRO and the 100 kHz X-Band FRO at 18:34. The BSR ends at 18:40, but the pace remains fast. We start Minical #2 at 18:40. When Minical #2 ends, we also return to the original FROs, and EOT is a minute later (18:56). We do the post-cal with 2 minute steps (rather than the usual 3), and should finish about 19:25. That gives the station 10 minutes to tear down before the next pass. My flight arrives at Burbank about 9 PM this evening. I'll be at the Best Western Pasadena Royale (626-793-0950) overnight and should be at the JPL front gate by 7 AM. I have a copy of the Visitor Request Form that Sami pushed through. I look forward to collecting some data on YOUR schedule for a change. Dick - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2008/185 (UTC) - - - - - - - 14:00 Begin Pre-cal at DSS 63 FGAIN = 60 dB (all channels, including X-RCP) FRO_X = 0; FRO_S = 0 Start 4-channel 25 kHz recordings after Step 4 Stop 25 kHz recording after Step 18 16:00 Begin track (spacecraft is X-Band, carrier only, 1-way) 17:21 S-Band Tx ON (carrier only, 1-way) 17:22 FRO_X = -11000 Hz (SCHAN 3) FRO_S = -10000 Hz (SCHAN 3) FRO_X = -40000 Hz (SCHAN 4) FRO_S = -40000 Hz (SCHAN 4) 17:25 Resume 25 kHz recording (SCHAN 3) 17:39 Occultation ingress 17:45 Ask station to switch to "planetary pointing" (center of Mars) 17:50 Begin MiniCal #1 18:05 End MiniCal #1 (end of Step 5) 18:22 Begin 4-channel 100 kHz recordings (SCHAN 4) 18:23 Occultion egress Expect X-RCP echo to build as it quickly drifts lower; others will be weak and maybe not visible 18:29 FRO_X = -22000 Hz (SCHAN 3) 18:32 FRO_X = -32000 Hz (SCHAN 3) 18:34 FRO_X = -42000 Hz (SCHAN 3) FRO_S = -19000 Hz (SCHAN 3) FRO_X = -80000 Hz (SCHAN 4) 18:36 FRO_X = -53000 Hz (SCHAN 3) If visible, the X-LCP echo should be stronger than X-RCP 18:38 FRO_X = -64000 Hz (SCHAN 3) 18:40 Begin SLEW #2 End 100 kHz recording (SCHAN 4) Begin Minical #2 18:55 End SLEW #2 End Minical #2 FRO_X = -11000 (SCHAN 3) FRO_S = -10000 (SCHAN 3) 18:56 EOT (24 minutes early) Begin Post-Cal (accelerated, 2 minute steps) 19:25 End Post-cal (if not before) End 25 kHz recordings End of Activity