PDS_VERSION_ID = PDS3 RECORD_TYPE = STREAM OBJECT = TEXT PUBLICATION_DATE = 2007-07-27 NOTE = " E-mail and other messages concerning MGS Radio Science on or about 1997/271." END_OBJECT = TEXT END From len@nova.Stanford.EDU Mon Sep 29 10:47:47 1997 Received: from nova.stanford.edu (nova.Stanford.EDU [36.10.0.123]) by magellan.Stanford.EDU (8.8.5/8.8.3) with ESMTP id KAA16933 for ; Mon, 29 Sep 1997 10:47:47 -0700 (PDT) Received: from [36.10.0.171] (exh2.Stanford.EDU [36.10.0.171]) by nova.stanford.edu (8.8.5/8.8.4) with SMTP id KAA08160; Mon, 29 Sep 1997 10:48:02 -0700 (PDT) Message-Id: <199709291748.KAA08160@nova.stanford.edu> Mime-Version: 1.0 Content-Type: text/plain; charset="us-ascii" Date: Mon, 29 Sep 1997 10:47:28 -0700 To: ahmad@nova.Stanford.EDU, rsimpson@nova.Stanford.EDU, joe@nova.Stanford.EDU, hinson@nova.Stanford.EDU, len@nova.Stanford.EDU, stoumpis@nova.Stanford.EDU From: len@nova.Stanford.EDU (Len Tyler) Subject: MGS Status, Saturday 9/27 Content-Length: 3946 Status: RO >X-Sender: cwhetsel@pop.jpl.nasa.gov >Mime-Version: 1.0 >Date: Sun, 28 Sep 1997 04:11:36 -0800 >To: msop@mgsw3.jpl.nasa.gov >X-UIDL: 875539894.002 >From: "Charles W. Whetsel" >Subject: MGS Status, Saturday 9/27 >Sender: owner-msop@mgsw3.jpl.nasa.gov >Precedence: bulk >Status: RO > >Saturday morning, shortly after periapsis 9, the MGS spacecraft was >commanded into Contingency Mode, in an attempt to correct a perturbation to >the spacecraft's star processing algorithm which had been introduced >following aerobraking maneuver 4 on September 23rd. > >DSN stations 45 and 43 in Canberra, Australia supported the activity. >After the stations had locked up on spacecraft telemetry via the low-gain >antenna at the emergency downlink rate of 10 bits per second, the flight >team in Denver and Pasadena were able to determine that the spacecraft >health was excellent and stable following the event. Command radiations to >initiate the spacecraft recovery process were issued shortly thereafter. >In record breaking time, the spacecraft flight software was able to >re-establish it's inertial reference (with respect to the stars) in the >Sun-Star Initialization mode, which was commanded following the spacecraft >Contingency Mode entry. > >At 14:30 UTC Saturday, after the inertial reference had been established, >the flight team commanded the spacecraft to begin spinning about the >earth-line, rather the sun-line, while still maintaining uplink and >downlink communications via the low gain antennae. By now, the handover to >the Madrid Deep-Space Communications Complex had occured (DSS 63 & 65). >Support from the 70M subnet was released back to the Galileo Project at >17:00, and by 19:15 UTC, the previously declared state of spacecraft >emergency was lifted. Support from TMOD, both the DSN and MGSO services, >was outstanding throughout. > >Throughout the day, attitude performance remained excellent and the flight >team continued work sending commands to the spacecraft to cleanup all >remaining effects of the Contingency Mode entry. Uplink and downlink >communications have both been restored to the high gain antenna, and the >sequence to control the spacecraft through periapsis 10 on Sunday morning >has been successfully loaded. The flight team is preparing commands to >playback data recorded onboard the spacecraft during and after the original >anomaly, and is also making plans for the reinitialization of those >spacecraft payload instruments which are supporting the aerobraking efforts >by making measurements of the Martian atmosphere. > >Following periapse 10, an aerobraking maneuver is planned a half orbit >later at apoapsis which will continue to place the spacecraft periapsis >lower in the Martian atmosphere (pending the results of periapse 10 and >other data available on the atmosphere). The payload data subsystem, which >was powered off along with the instruments upon Contingency Mode entry, >will be reinitialize on Sunday, while plans are currently under evaluation >to repower the instruments, themselves, in a 5-hour window after apoapsis >#10 on Monday (during, roughly, prime shift PDT). > >Overall, spacecraft health and performance continue to be excellent and the >effects of this minor perturbation on the long-term aerobraking and other >mission objectives are negligible. With the re-initialization of the >payload Monday, the project will have fully returned to normal aerobraking >operations. > >Charles Whetsel > >Mars Surveyor Ops >Phone: (818) 393-7758