2005-08-12T11:43:00, MRO Launch. CRISM software version 4. Last update to macro library 20050620. Cooler 1 on time 105:03:00. Cooler 2 on time 188:50:00. Cooler 3 on time 99:16:00. Total gimbal cycles: 600. Total shutter cycles: 2000. 2005-08-12T14:15:00, CRISM survival heaters become active. Spectrometer housing setpoint -60C. Cooler radiator setpoint -25C. DPU setpoint -13C. GME setpoint -13C. 2005-08-15T17:30:00, CRISM decontamination heater settings begun. Spectrometer housing new setpoint +20C. Cooler radiator new setpoint +20C. DPU continues setpoint -13C. GME continues setpoint -13C. 2005-08-27T22:00:00, MRO trajectory correction maneuver 1 (TCM-1). MRO thrusters fired to correct course. Spacecraft attitude perturbed instrument temperature slightly. 2005-08-29T14:20:00, CRISM survival heater settings resumed. Spectrometer housing new setpoint -60C. Cooler radiator new setpoint -25C. DPU continues setpoint -15C. GME continues setpoint -15C. 2005-08-30T15:35:45, CRISM powered on. Instrument checkout begins. 2005-08-30T15:35:45, Spectrometer housing temperature has reached only -85C not -105C goal. Hypothesis is that VNIR electronics trim heater is dumping heat into housing. Will lower setting at next turn on and checkout. 2005-08-30T17:42:28, Cooler 1 powered on. 2005-08-30T17:42:48, Cooler 1 powered off. New cooler 1 on time 105:03:20. 2005-08-30T18:20:15, Cooler 2 powered on. 2005-08-30T18:20:35, Cooler 2 powered off. New cooler 2 on time 188:50:20. 2005-08-30T18:51:25, Cooler 3 powered on. 2005-08-30T18:51:25, Cooler 3 powered off. New cooler 3 on time 99:16:20. 2005-08-30T20:17:04, First inflight functional test using test pattern at combinations of binning; frame rate; lossy and lossless exposure. This tests functionality of FPGAs. Results nominal. 2005-08-30T21:18:37, First inflight gimbal torque test. Gimbal scanned at high rate to measure current required. Analysis showed 17% increase in required torque compared to ground testing. 2005-08-30T22:54:36, Cooler 1 powered on for cooldown. 2005-08-30T23:01:20, First inflight test of gimbal following S curve. Results nominal. 2005-08-31T06:26:21, Cooler 1 safed. Reason: IR detector 1 low temperature alarm limit is higher temperature than intended. Needs to be updated. New cooler 1 on time 112:35:06. 2005-08-31T14:09:32, First inflight acquisition of detector data using combinations of binning; frame rate; lossy and lossless exposure. Results nominal except for high IR background due to warm detector temperature following safing. 2005-08-31T15:05:24, CRISM powered off. 0 shutter cycles and 4 gimbal cycles were completed. New total gimbal cycles: 604. 2005-09-21T12:00:00, Electra/Stanford calibration. Test concluded at 2005-09-22T16:00:00. Relay calibration required significant change in S/C attitude. The effect on the instrument thermal state is clearly evident in the CRISM temperature telemetry. 2005-10-19T22:20:00, CRISM decontamination mode activated. Spectrometer housing setpoint +20C. Cooler radiator setpoint +20C. 2005-10-26T21:00:00, S/C gyro calibration. S/C rotated so sun was incident on back of solar panels. Bus voltage droped by ~2.7V. Voltage, current, and temperature excursions present in telemetry data. All telemetry plots recoverd to decontamination levels by 2005-10-27T08:00:00. 2005-11-02T16:00:00, Thruster Cal #2 - RZ019/RZ021 (MCR 5049, SCR 5075). Minor excursion in current, temperature, and voltage telemetry. All telemetry recovered to decontamination levels by 2005-11-03T17:00:00. 2005-11-18T21:45:00, TCM2 - RZ022/RZ029 (SCR 5218). Minor excursion in current, temperature, and voltage telemetry. All telemetry recovered to decontamination levels by 2005-11-19T06:00:00. 2005-11-29T16:45:00, ONC calibration - RZ023/RZ027 (MCR 5056, SCR 5183). Change in S/C attitude reflected strongly in OSU, DPU, and GIMEL temperature plots. All telemetry recovered to decontamination levels by 2005-12-01T00:00:00. 2005-12-09T21:00:00, End CRISM decontamination mode. Spectrometer housing setpoint -60C. 2005-12-13T23:55:28, Start L+125 checkout. 2005-12-13T23:59:42, Cooler 2 powered on. 2005-12-14T16:09:42, Cooler 2 powered off. Cooler on duration 16:10:00. New cooler 2 on time 205:00:20. 2005-12-15T04:46:33, End L+125 checkout. Shutter cycles: 0; Gimbal cycles: 2; Total shutter cycles: 2000; Total gimbal cycles: 606. 2006-01-18T22:26:00, CRISM powered on. 2006-01-18T22:45:25, Cooler 1 powered on. 2006-01-19T20:07:40, Cooler 1 powered off. Cooler 1 on duration 21:22:15. New cooler 1 on time 133:57:21. 2006-01-19T20:10:00, CRISM powered off. Shutter cycles: 0; Gimbal cycles: 4; Total shutter cycles: 2000; Total gimbal cycles: 610. 2006-03-25T13:16:00, CRISM powered on. 2006-03-25T13:26:20, Cooler 1 powered on. 2006-03-25T13:56:24, Cooler 1 powered off. Cooler 1 on duration 00:30:04. New cooler 1 on time 134:27:25. 2006-03-25T14:26:26, Cooler 2 powered on. 2006-03-25T14:56:26, Cooler 2 powered off. Data gap prevents confirmation of exact power off time. New cooler 2 on time 205:30:20. 2006-03-25T15:26:38, Cooler 3 powered on. 2006-03-25T15:56:42, Cooler 3 powered off. Cooler 3 on duration 00:30:04. New cooler 3 on time 99:46:24. 2006-03-25T16:49:00, CRISM powered off. Shutter cycles: 0; Gimbal cycles: 0; Total shutter cycles: 2000; Total gimbal cycles: 610. 2006-06-20T17:27:00, CRISM powered on. 2006-06-20T17:27:43, Macro library updated to 20060516. 2006-06-20T18:19:32, Cooler 1 powered on. 2006-06-20T18:49:35, Cooler 1 powered off. Cooler 1 on duration 00:30:03. New cooler 1 on time 134:57:28. 2006-06-20T20:02:33, Cooler 2 powered on. 2006-06-20T20:32:36, Cooler 2 powered off. Cooler 2 on duration 00:30:03. New cooler 2 on time 206:00:23. 2006-06-20T21:02:43, Cooler 3 powered on. 2006-06-20T21:32:47, Cooler 3 powered off. Cooler 3 on duration 00:30:04. New cooler 3 on time 100:16:28. 2006-06-21T01:40:00, Software updated to version 5. 2006-06-21T02:05:00, CRISM powered off. Shutter cycles: 0; Gimbal cycles: 0; Total shutter cycles: 2000; Total gimbal cycles: 610. 2006-09-25T15:45:21, CRISM powered on. Begin ITL Checkout phase. 2006-09-26T16:02:51, Cooler 1 powered on. 2006-09-27T16:29:00, Cover open. 2006-10-05T06:07:40, Cooler 1 powered off. Cooler 1 on duration 178:04:49. New cooler 1 on time 313:02:17. 2006-10-05T06:37:54, Cooler 2 powered on. 2006-10-05T07:07:40, Cooler 2 powered off. Cooler 2 on duration 00:29:46. New cooler 2 on time 206:30:09. 2006-10-05T07:37:45, Cooler 3 powered on. 2006-10-06T17:42:08, Cooler 3 powered off. Cooler 3 on duration 34:04:23. New cooler 3 on time 133:50:47. 2006-10-06T17:42:08, CRISM powered off. Shutter cycles: 1033; Gimbal cycles: 91; Total shutter cycles: 3033; Total gimbal cycles: 701. 2006-11-06T17:07:26, CRISM powered on. Begin Primary Science Phase. Macro update to 20061102 including offset to gimbal nadir. 2006-11-06T17:13:30, Cooler 1 powered on. 2006-11-12T00:40:51, End PSP RM001 week 1. Additional shutter cycles: 917. Additional gimbal cycles: 22. Additional cooler 1 on time: 127:27:21. Total cooler 1 on time 440:29:38. Total cooler 2 on time 206:30:09. Total cooler 3 on time 133:50:47. Total shutter cycles: 3950. Total gimbal cycles: 723.