2002-05-08T00:06:58.000 \header System = GRS Author = mward Institution = UofAz Start_time = 05/08/02 15:15 Stop_time = 05/08/02 19:15 Send_time = Wed May 08 00:06:58 GMT 2002 \text Purpose: To increase the temperature of the GRS warm anneal from 75C to 105C on the OS. Expected result: The thermostatic control setpoints of the GRS MR (using MR primary on sensor B) and OS (using OS secondary on sensor A) will be changed to 100C and 105C, respectively. The gamma subsystem will be turned off, and GPA heater 3 will be turned on full. The MR secondary heater will be turned on full, and the Op Why it is needed: The GRS detector resolution is still not optimal, even after the last warm anneal to OS 75C (IS 50C). GRS is therefore performing another anneal at warmer temperatures in order to enhance detector resolution before boom deployment. The warmer anneal also puts the GSH in a thermally favorable Commands to be sent: /home/grs2001/software/SC_Commands/Post-MOI_1/bce_bcf/c01grs_warm_ann_75_to_10 1244, immediate, CHG_ANALOG, CEB_ALT_ACTUATOR_CURR, COLLECTION, 3 2450, immediate, CHG_ANALOG, GAMMA_GPA_TEMP, COMPARE_SETTING, 0 1322, + 0-1 , CHG_GPA_HTR, 4 2004, + 0-2 , CHG_CLCT, Gamma, OFF 2002, + 0-3 , CHG_STATE, Gamma, OFF 2873, + 0-6 , CHG_ANALOG, CEB_MNT_RNG_TEMP_B, LESS_COMPARE_VALUE, 10848 2874, + 0-6 , CHG_ANALOG, CEB_MNT_RNG_TEMP_B, GREATER_COMPARE_VALUE, 1325, + 0-7 , OP_HTR, OFF 1308, + 0-7 , ANNEAL_PWR_CNTRL, 3, ON 2746, + 0-187 , CHG_ANALOG, CEB_OS_TEMP_A, LESS_COMPARE_VALUE, 10567 2745, + 0-187 , CHG_ANALOG, CEB_OS_TEMP_A, GREATER_COMPARE_VALUE, 10576 1041, + 0-188 , EXEC_SEQ, 41, 0 2002-05-08T18:31:50.000 \header System = GRS Author = mward Institution = UofAz Start_time = 05/08/02 18:30 Stop_time = 05/08/02 19:15 Send_time = Wed May 08 18:31:50 GMT 2002 \text Purpose: To turn on the GRS mounting ring operational heater to assist the the overall Expected result: The MR will get closer to the 100C control. Why it is needed: The MR needs to be not more than 15 degrees cooler than the OS. The Op heater Commands to be sent: /home/grs2001/software/SC_Commands/Post-MOI_1/bce_bcf/c01grs_op_htr_on_anneal_ 1324, immediate, OP_HTR, ON 1041, + 0-1 , EXEC_SEQ, 41, 0ast warm anneal to OS 75C (IS 50C). GRS is therefore performing another anneal at warmer temperatures in order to enhance detector resolution before boom deployment. The warmer anneal also puts the GSH in a thermally favorable state for the pre-boom deployment test Commands to be sent: /home/grs2001/software/SC_Commands/Post-MOI_1/bce_bcf/c01grs_warm_ann_75_to_10 1244, immediate, CHG_ANALOG, CEB_ALT_ACTUATOR_CURR, COLLECTION, 3 2450, immediate, CHG_ANALOG, GAMMA_GPA_TEMP, COMPARE_SETTING, 0 1322, + 0-1 , CHG_GPA_HTR, 4 2004, + 0-2 , CHG_CLCT, Gamma, OFF 2002, + 0-3 , CHG_STATE, Gamma, OFF 2873, + 0-6 , CHG_ANALOG, CEB_MNT_RNG_TEMP_B, LESS_COMPARE_VALUE, 10848 2874, + 0-6 , CHG_ANALOG, CEB_MNT_RNG_TEMP_B, GREATER_COMPARE_VALUE, 1325, + 0-7 , OP_HTR, OFF 1308, + 0-7 , ANNEAL_PWR_CNTRL, 3, ON 2746, + 0-187 , CHG_ANALOG, CEB_OS_TEMP_A, LESS_COMPARE_VALUE, 10567 2745, + 0-187 , CHG_ANALOG, CEB_OS_TEMP_A, GREATER_COMPARE_VALUE, 10576 1041, + 0-188 , EXEC_SEQ, 41, 0