2003-05-22T14:37:54.000 \header System = GRS Author = mward Institution = UofAz Start_time = 05/22/03 15:00 Stop_time = 05/27/03 16:50 Send_time = Thu May 22 14:37:54 GMT 2003 \text Purpose: Update EEPROM sequences 4B. Sequences 4B will disable the fault protection for the gamma HV for a UHF test. The sequence is being changed to remove the time-relative commanding 65-second delay because there is only a 1-minute delay between the GRS pass-through and the UHF transmitter commands in the LMA Expected result: The sequence will be modified. Why it is needed: The fault protection must be disabled during the UHF test due to possible Commands to be sent: /home/mward/Deployed_1/c01grs_s04b_gam_hv_safe_off_2.bfl 3104, immediate, CHG_SEQ, 48, B-4, 4 0: immediate, CHG_ANALOG, CEB_IS_TEMP_A, COMPARE_SETTING, 0, 0 1: immediate, CHG_ANALOG, GAMMA_ELEC_FAST, COMPARE_SETTING, 0, 0 2: + 3600 , CHG_ANALOG, CEB_IS_TEMP_A, COMPARE_SETTING, 1, 0 3: + 3600 , CHG_ANALOG, GAMMA_ELEC_FAST, COMPARE_SETTING, 2, 0 2003-05-22T14:41:35.000 \header System = GRS Author = mward Institution = UofAz Start_time = 05/22/03 15:00 Stop_time = 05/27/03 16:50 Send_time = Thu May 22 14:41:35 GMT 2003 \text Purpose: Dump memory associated with GRS EEPROM sequence 4B and nominal dumps. Expected result: 6 dump packets. Why it is needed: To verify that the contents of GRS EEPROM sequence 4B and to check instrument Commands to be sent: /home/mward/Deployed_1/c01grs_dump_test_34.bcf 1154, immediate, DUMP_SEQ, 4, 1 1041, + 0-4 , EXEC_SEQ, 41, 0