2003-08-12T17:32:29.000 \header System = GRS Author = mward Institution = UofAz Start_time = 08/12/03 18:35 Stop_time = 08/13/03 13:25 Send_time = Tue Aug 12 17:32:29 GMT 2003 \text Purpose: Stop the current duty cycle control of the OS Secondary heater and start it on Expected result: The duty cycle control will operate using EEPROM sequences 31b, 32b, 33b, and Why it is needed: To switch back to the nominal set of EEPROM sequences that have been modified to avoid a delayed-command issue that locks the OS Secondary heater full off or locks the duty cycle on without a temperature control, and to perform a Commands to be sent: /home/mward/Deployed_1/c01grs_os_s_a_htr_duty_delta_2.bcf 2027, immediate, CHG_ANALOG, CEB_OS_TEMP_B, COMPARE_SETTING, 0 2400, immediate, CHG_ANALOG, CEB_AGND_SPARE2, COMPARE_SETTING, 0 2349, immediate, CHG_ANALOG, CEB_OS_TEMP_A, COMPARE_SETTING, 0 1133, + 0-1 , EXEC_SEQ, 33, 1 2029, + 0-2 , CHG_ANALOG, CEB_OS_TEMP_B, COMPARE_SETTING, 2 1041, + 0-6 , EXEC_SEQ, 41, 0